Independent review of the Great Green Wall accelerator
Publication year
Resource type
Evaluation reports
An independent external review of the results and performance of the Great Green Wall Accelerator was conducted in September 2022 – January 2023 by Mr. David Todd. This review provides an evidence-based consideration of progress, success and challenges of the Accelerator so far, with the aim to further enhance its services. In addition to the full report of the review, a summary version and the UNCCD management response, both in English and French, are provided.